We provide:

- Rigging Seminars

- Pre-production and planning

  1. -Assessment of challenges with resolvable solutions

  2. -CAD drafting and drawings

  3. -Load distribution calculations with resultant forces to structure and building

  4. -Building or structure evaluations

  5. -Rigging plots & weight charts

  6. -Gear list

  7. -Sequential load in and strike advisement

  8. -Technical Direction

  9. -On-site management

  10. -Operational procedures and practices

  11. -Safe working techniques and equipment use

  12. -Fast and efficient rigging methods

  13. -Fall protection needs and evaluation

  14. -Qualified staffing of Up riggers, Down riggers, Climbing riggers and Lift operators.

    BNW Rigging has over 20 year experience in live event production. We are the guys that now preface advice with: “When I was on tour,...” or “there was this one time...”

    Our aged wisdom and time tested procedures excel our use of modern techniques and gear.

We take the best of the old school methods and apply our problem solving skills to provide the most concise service anywhere.

    Unsure if the 1/4 ton is good for your 20.5” truss loading? How much weight can this 1/8 cable hold? Let our experts make the calculations for you.

BNW Rigging Consultants LLC. All rights reserved.

Contact:

jeff@bnwrigging.com

tonyb@bnwrigging.com

All your verticality vending:

PETZL Harnesses, PETZL carabiners, PETZL fall protection, ropes, and more.

(we like PETZL)